How to paint the Conveyor Chain correctly:

1. The surface that has been sprayed and dusted by Conveyor Chain should be immediately primed. Paint should be carried out in a clean place. The ambient temperature should be above 5℃, the humidity should be below 85%, and the surface temperature of the workpiece should not exceed 60. ℃;

2. When there are no special requirements for each component, one primer (excluding maintenance primer) and two topcoats should be applied. Paint leakage is not allowed. The color of each layer should be different. The dry film thickness of each layer is 25~ 35 um, the total thickness of the paint dry film is not less than 75um; Conveyor Chain smooth roller and roller working surface can only be coated with a layer of anti-rust paint or topcoat, and the inner wall of the roller is coated with rust paint. The exposed processing mating surface should be coated with protective grease, and the exposed processing non-matching surface (excluding the frame body) should be coated with topcoat or primer, and the dry film thickness should be at least 35 feet;

3. After installation and debugging, the topcoat should be applied again, and the damaged parts during transportation and installation should be repaired before painting;

4. The primer and middle coat of Conveyor Chain are not allowed to have defects such as pinholes, bubbles, cracks, shedding, sagging, and missing coating; the topcoat must be uniform, bright and complete.